Skip to content
Search
Topic · standing beatupdated Sat, 24 Oct, 14:30

Polavaram project

6 stories · 3 outlets · last 7 days

Stories

6

+4vs prior 7d (2)

Read: Coverage rose against the previous seven days.

n=6 · last 7 days · stream A · coverage · floor 5

Measured claims

0

0 corroborated · 0 contested

Read: Claims another outlet's reporting corroborated, and claims another outlet's reporting contradicted. Neither is a verdict on whether the claim is true.

n=0 · last 7 days · stream A · coverage · floor 5

Most-flagged phrase

Not enough coverage (n=0, need 5)

Read: The phrase this beat's stories most often flagged as loaded, and how many used it at all. We do not suggest what a newsroom should have written instead.

n=0 · last 7 days · stream A · coverage · floor 5

This week’s lead · most outlets

World · 18 Oct

International experts conclude review of Polavaram project

AI summaryA team of international experts completed a four-day review of the Polavaram project, inspecting the Earth-Cum-Rock Fill dam and related facilities. They expressed satisfaction with the construction quality and advised the project authorities to maintain established testing procedures and documentation. The review involved officials from the Polavaram Project Authority, State Water Resources Department, and Megha Engineering & Infrastructures Limited.

11 outlets

Also on this beat

Beat timeline · 6 months

1 most-covered story

  1. 14 Oct 26పోలవరం ప్రాజెక్టులో అంతర్జాతీయ నిపుణుల ఎనిమిదో పర్యటన..2 outlets

Large dot = 8 or more outlets covered it · cyan = official filing · magenta = protest or civil action. The two tags come from words in each story’s own title, printed above, and are not a measurement.

Everything on this beat

ranked by relevance, not counted in the figures above

20 stories loaded