Analysis. Vekuva's measurement of another outlet's report. The reporting is the outlet's; the framing analysis is ours. · Eenadu
Vekuva’s reading of Eenadu’s report
Malkangiri-Bhadrachalam: మల్కన్గిరి-భద్రాచలం కొత్త రైల్వే లైన్కు ముంపు ముప్పు
By Eenadu2 min read at Eenadu
In brief
The article reports that a 65 km segment of the new Malkangiri-Bhadrachalam railway line in Andhra Pradesh falls within the Polavaram reservoir submergence zone, prompting officials to conduct a field survey to alter the alignment.
Railway officials have stated that changing the pre-approved route is not feasible, while revenue officials have highlighted the issue to the Polavaram Collector.
The project, estimated at ₹2,864 crores, will now require tunnels in some areas and may see an increase in its projected cost.
This is an AI-estimated analysis and may not reflect the article's actual intent or the publisher's editorial position.
Read this page in English · Google Translate (opens translate.google.com in a new tab)Machine translation by Google, not checked by Vekuva
ఏపీలోని 65 కి.మీ. మార్గంలో అత్యధికం పోలవరం ముంపు ప్రాంతమే ఆలస్యంగా గుర్తించిన అధికారులు ఎలైన్మెంట్లో మార్పు కోసం సర్వే
ఈనాడు, అమరావతి: ఒడిశాలోని మల్కన్గిరి నుంచి ఏపీలోని పోలవరం జిల్లా మీదుగా తెలంగాణలో భద్రాచలం, పాండురంగాపురం వరకు నిర్మించనున్న కొత్త రైల్వేలైన్లో కొంత భాగం పోలవరం జలాశయ ముంపు ప్రాంత పరిధిలో ఉన్నట్లు తేలింది. దీంతో ఎలైన్మెంట్ మార్చేందుకు అధికారులు క్షేత్రస్థాయిలో సర్వే చేస్తున్నారు. మల్కన్గిరి నుంచి భద్రాచలం, పాండురంగాపురం వరకు 173.61 కి.మీ. పూర్తిగా ఏజెన్సీ ప్రాంతం మీదుగా కొత్త రైల్వే లైన్ను ఇటీవల రైల్వేశాఖ మంజూరు చేసింది. ఇందులో ఒడిశాలోని మల్కన్గిరితోపాటు, బడలి, పనిమట రాజన్గూడ, లచ్చిపేట, కందపల్లి, మోటు, ఏపీలోని పోలవరం జిల్లాలోని కుయుగూరు, సీతారామపురం, భీమవరం, రాజుపేట, తెలంగాణలోని…
That is the opening of Eenadu’s story. The full report is on their site.
Read the full story at Eenadu (opens in a new tab)